Program

Day 1
09:00 Registration and morning coffee
09:30 The Chairman welcomes the course
09:40 Basics of LCC analysis

  • Background, purpose & goals
  • LCC analysis conditions and methods (NPV, continuous NPV and EAC)
  • (NS, OL, Loans, Infinite Lifetime Options)
  • Practical LCC analysis examples from real life
  • Infrastructure Lifecycle: The Planning / Construction Process
  • LCC analysis applications and implementation for bridges and roads
  • How to achieve the best socio-economic solution?
  • How do you optimize and evaluate different strategies?

Mohammed Safi, LCC analysis expert consultant, FOLKBRO

10:30 Morning coffee
11:00 Economics and market constraints

Håkan Sundquist, Professor. KTH, Steel and bridge building.

11:45 Follow-up of the Swedish Transport Administration’s latest requirements regarding LCC analysis of bridges and roads and how this requirement can be met.
12:30 Lunch
13:30 Necessary tools for LCC analysis

  • BaTMan
  • WebHybris
  • Excel (Data Analysis – Pivot Tables)
  • Practical knowledge of how to benefit from BaTMan in LCC analysis for bridges
  • Procurement strategies and consequences

Mohammed Safi, LCC analysis expert consultant, FOLKBRO

14:30 LCC added value analysis method

  • LCC added value analysis method
  • Bridge life cycle measures
  • Restrictions on Bridge Investment
  • How do we handle this today?
  • Can we do better?
  • Monitor / measure
  • What does the future look like?

Mohammed Safi, LCC analysis expert consultant, FOLKBRO

15:15 Afternoon coffee
15:45 LCC for the Railway Bridge over the Huvudnäskanalen: Should the bridge be repaired or replaced?

Mohammed Safi, LCC analysis expert consultant, FOLKBRO

16:45 Time for questions
17:00 The Chairman summarizes the day

What
Course: Lifecycle cost analysis (LCC analysis) of Bridges and Roads

When
To be announced later

Where
Stockholm – Lindhagen conference, Lindhagensgatan 126