Name |
Preparation of tender documentation and environmental documents for execution-contract for projects Migration obstacles Fish |
Vilhelmina Kommun | |
Client |
The main client is the Swedish Transport Administration. We work as sub-consultants with VR-Infrapro Ellinor Sangberg-Karlsson ellinor.sangberg-karlsson@vrinfrapro.se Mission leader | Infrapro | Design & Consulting +46 70 610 73 65 |
Mission time |
May 2018 – May 2019 |
Role/Task |
Mission leader: Cost estimation, LCC analysis |
Project cost |
ca. 20 mnkr |
Mission statement |
The assignment consists of LCC analysis and construction cost estimation for three objects for different locations in northern Sweden. Step 1, LCC analysis was performed to compare five bridge solutions, and in the next MAP calculation is used to price the finished MF of the selected solution from step 1. Measures include replacing existing bridges and rebuilding existing roads. |
Experience from the assignment |
Good knowledge of the Swedish Transport Administration’s working methods regarding base calculations and calculation PM. Good experience of calculation work and production planning to ensure the quality of the prepared basis calculations and calculation PM. |
Link to project |
|
Work samples available |
Yes |