Migration obstacles Fish

Name
Preparation of tender documentation and environmental documents for execution-contract for projects Migration obstacles Fish
Vilhelmina Kommun
Client
The main client is the Swedish Transport Administration. We work as sub-consultants with VR-Infrapro
Ellinor Sangberg-Karlsson
ellinor.sangberg-karlsson@vrinfrapro.se
Mission leader | Infrapro | Design & Consulting
+46 70 610 73 65
Mission time
May 2018 – May 2019
Role/Task
Mission leader: Cost estimation, LCC analysis
Project cost
ca. 20 mnkr
Mission statement
The assignment consists of LCC analysis and construction cost estimation for three objects for different locations in northern Sweden. Step 1, LCC analysis was performed to compare five bridge solutions, and in the next MAP calculation is used to price the finished MF of the selected solution from step 1. Measures include replacing existing bridges and rebuilding existing roads.
Experience from the assignment
Good knowledge of the Swedish Transport Administration’s working methods regarding base calculations and calculation PM. Good experience of calculation work and production planning to ensure the quality of the prepared basis calculations and calculation PM.
Link to project
Work samples available
Yes